• Architecture
    • Approach & Services
    • Projects
  • Innovation
  • Ecology
  • About
    • Our Story
    • Our Team
    • Family of Companies
    • Our Clients
    • News
  • Contact

Site Work: Formwork Installation

Once the underslab insulation was installed we proceeded with installing the foundation formwork, another process that was rather simple and quick. For the foundation of the building we will be using a grade beam system, similar to a slab on grade. To create the grade beam, we used prefabricated, insulated formwork called: insulated concrete forms (ICFs). While the system costs are comparable to an ordinary wood-framed formwork, the thermal performance is significantly greater. P1090711 ICFs are made of clipped together insulated panels, in which the concrete is poured. The plastic clip system that holds the panels together also supports the rebar, holding it securely in place during installation. P1090728 The benefits of the prefabricated, clip together sections are the reduced cost and improvement of energy efficiency with fast installation. You can read more blog posts about the GO Home here.

Share
Related Posts

May 13, 2025

No More Fried Eggs

May 6, 2025

Great Design is Regenerative Design

August 29, 2023

Camp Business: Passive Projects
©2025 OPAL Global, LLC
Contact
  • Architecture
    • Approach & Services
    • Projects
  • Innovation
  • Ecology
  • About
    • Our Story
    • Our Team
    • Family of Companies
    • Our Clients
    • News
  • Contact